Projects

A selection of cooling, water and utility installations delivered across Bangladesh.

120+Plants delivered
38Cities served
850 TRLargest chiller plant
Bank of MHM cross-flow cooling towers installed at a factory in Bangladesh
Portfolio

Installations that keep production cool

Filter by system type

Aerial view of a rooftop chilled-water plant with air cooled chillers and cooling towers
Featured

Padma Textile Mills — rooftop chilled-water plant

NarayanganjTextile2025
  • 2 × MHM ACS-120 air cooled chillers
  • 3 × FRP counter-flow cooling towers
  • Chilled-water pumps & insulated piping
  • BMS integration
Cross-flow cooling tower bank at Karnaphuli Steel
SteelChattogram2024

Cross-flow cooling tower bank

Karnaphuli Steel — 4 × 400 RT cross-flow towers for furnace and mill cooling.

Case study
Water cooled screw chiller plant at Meghna Pharmaceuticals
PharmaceuticalsGazipur2024

Water cooled screw chiller plant

Meghna Pharmaceuticals — 2 × MHM WCS-350 screw chillers with N+1 redundancy.

Case study
Chilled-water pumping station at Rupsha Spinning Mills
TextileKhulna2023

Chilled-water pumping station

Rupsha Spinning Mills — 6 × end-suction pumps on VFD with header and bypass.

Case study
LT panel and distribution board at Sundarban Foods
Food & BeverageSavar2024

LT panel & distribution

Sundarban Foods — 1600 A LT main panel, PFI bank and 12 distribution boards.

Case study
Industrial axial ventilation fans installed at Teesta Garments
GarmentsAshulia2025

Factory ventilation upgrade

Teesta Garments — 48 × Amfin axial fans with evaporative pads for 6 floors.

Case study
Plate heat exchangers for heat recovery at Jamuna Polymers
PlasticsTongi2023

Heat recovery with plate heat exchangers

Jamuna Polymers — 3 × gasketed PHE recovering process heat for boiler feed.

Case study
Stainless process piping for the RO and softener plant at Halda Beverages
BeverageChattogram2024

RO + softener plant

Halda Beverages — 40 m³/h two-pass RO with duplex softener and Finor dosing.

Case study
BMS and VFD control panel at Shitalakshya Paper
PaperNarayanganj2025

BMS & VFD retrofit

Shitalakshya Paper — SIEMENS BMS with 14 VFDs on AHUs, pumps and tower fans.

Case study
FRP counter-flow cooling towers at Buriganga Dyeing
DyeingKeraniganj2023

FRP counter-flow towers

Buriganga Dyeing — 5 × 250 RT round FRP towers replacing corroded steel units.

Case study
Deliverables

What clients get on every project

Documentation and support that make the plant easy to run long after handover.

As-built drawings

Final P&ID, layout and single-line diagrams exactly as installed.

Commissioning report

Measured flows, temperatures and power against the design values.

Spare-parts list

Recommended 2-year spares with part numbers and lead times.

12-month support

Free site visits and phone support through the first year of operation.

Testimonials

What plant managers say

The rooftop plant was commissioned two weeks ahead of our peak season and has held 7 °C supply without a single trip. Their team documented everything, so our own technicians run it confidently.

RH
Rafiqul HasanPlant Manager, Padma Textile Mills

MHM sized the screw chillers with real load data instead of a rule of thumb, and our energy bill dropped noticeably in the first quarter. Commissioning was clean and the BMS trends are exactly what audit needs.

SA
Sharmin AkterHead of Engineering, Meghna Pharmaceuticals

Replacing our steel towers with FRP units was done over one Eid shutdown with zero impact on the mill. The spare-parts list and follow-up visits are why we signed the AMC the same month.

TI
Tanvir IslamGeneral Manager, Karnaphuli Steel