Design & Engineering
Cooling-load calculation, equipment selection and plant-room layout with piping and electrical drawings — before a single machine is ordered.

Every MHM project starts on paper. Our engineers measure the real load on site — process heat, occupancy, ambient, water quality, available power — and size the chiller, cooling tower, pumps and pipes for Dhaka conditions rather than catalogue conditions. That is why an MHM plant rarely short-cycles in winter or runs out of capacity in May.
You receive a complete design package: load calculation, equipment schedule, plant-room layout, chilled/condenser-water schematics, pump and pipe sizing, single-line electrical diagram and a bill of quantities you can tender or hand straight to our installation team.
We design for the whole life of the plant: service clearances, future expansion tie-ins, redundancy where a stoppage costs more than a standby pump, and controls that let a BMS or a night-shift operator run it safely.
Everything design & engineering covers
Cooling & heat-load calculation
Process, envelope and ventilation loads at 46 °C ambient and 29 °C wet-bulb; diversity applied per shift pattern.
Equipment selection
Chiller, tower, pump, AHU and heat-exchanger selections with part-load performance and power demand.
Plant-room & piping layout
GA drawings, chilled/condenser-water schematics, pipe sizes at ≤ 2 m/s, valve and instrument schedule.
Electrical single-line diagram
Feeder sizes, starter types, VFD points, generator change-over and earthing for the utility block.
Controls philosophy
Sequence of operation for staging, reset, lead/lag and alarms — ready for BMS integration.
Bill of quantities & budget
Itemised BOQ with budget price bands so you can plan capex before tendering.
From first call to handover
- 1
Site survey
Load measurement, utility audit, photos and dimensions — inside Dhaka within 48 hours.
- 2
Concept & options
Two or three plant options with capex, running cost and footprint compared.
- 3
Detailed design
Drawings, schedules and BOQ issued for your approval; one revision round included.
- 4
Handover to execution
Approved package goes to procurement and our site team — or to your contractor.
Design & Engineering for every part of the utility block
The product families our engineers design, install and service under this offering.
Electric Chillers
Air-cooled and water-cooled chillers from 10 to 850 TR, with genuine spares.
Cooling Towers
FRP counter-flow and cross-flow towers, 10–1500 TR, plus infill, nozzles, fans and motors.
HVAC Systems
AHU, FCU, VRF and ducted-split systems for factories, hospitals and offices.
Ducting, Piping & MEP
GI/PI ducting, chilled-water piping, insulation and full MEP contracting.
Pumps
End-suction, inline, split-case, booster and submersible pumps with VFD packages.
Water Treatment Plants
RO, DM and softener plants, 1–150 m³/h, for boilers, dyeing and pharma.
Building Management Systems
SIEMENS Desigo and KMC Conquest BACnet systems for plants and buildings.
Electrical Panels
LT/HT switchboards, distribution, PFI, motor control and VFD panels.
Common questions about design & engineering
No. The design package is a paid deliverable on its own; the fee is credited against the order if you later buy the plant from us.
Yes — retrofits are half our design work. We survey the existing chillers, towers and pumps, keep what performs and redesign the rest.
A site visit slot, your production schedule or occupancy pattern, a recent electricity bill and, if available, existing drawings.
Other services
Supply & Installation
Chillers, towers, pumps, AHUs and panels delivered, rigged, piped and wired by our own site teams — one contractor, one warranty.
Testing & Commissioning
Flow balancing, approach and Δt checks, vibration and electrical tests — signed off in a commissioning report you can hand to an auditor.
Annual Maintenance Contract
Scheduled visits, water-side and air-side cleaning, chemical dosing and a written log after every visit — Basic, Standard or Comprehensive.
Repair & Overhaul
Compressor swaps, motor rewinding, coil and tube cleaning, tower fill replacement and VFD retrofits — with a 48-hour diagnosis.
Genuine Spare Parts
Infill, nozzles, sprinklers, fans, motors, seals, controllers and compressors stocked in Mirpur for MHM, Carrier, TICA, Genius and Newin equipment.
Water Treatment Programme
Scale, corrosion and biological control for cooling towers, chillers and boilers — chemicals, dosing equipment, monthly analysis and one accountable engineer.
Energy Audit & Retrofit
Measured kW/TR of your existing plant and a costed retrofit plan — VFDs, chiller sequencing, tower fan control, pump right-sizing — with payback you can verify.
Talk to the team that does the work
Tell us your plant, brand and problem — an MHM engineer replies within one working day with next steps and a price.