Service

Testing & Commissioning

Flow balancing, approach and Δt checks, vibration and electrical tests — signed off in a commissioning report you can hand to an auditor.

Duration2–5 days per plant
InstrumentsCalibrated flow, power, IR
ReportSigned baseline log
TrainingIncluded
Testing & Commissioning — MHM Engineering

A plant is not finished when it runs; it is finished when it runs at the numbers on the drawing. MHM commissioning engineers balance water and air flows, verify chiller approach temperatures and Δt, set controls and protections, and record every reading in a report that becomes the baseline for the life of the plant.

We commission MHM installations and third-party plants alike — including re-commissioning of old systems that have drifted from design after years of ad-hoc changes.

What is included

Everything testing & commissioning covers

Water & air balancing

Flows set to design at every coil, tower cell and AHU with a balancing report.

Performance verification

Chiller approach, Δt, kW/TR, tower approach and range measured against the selection.

Electrical tests

Insulation resistance, phase balance, overload settings, VFD parameters and thermography.

Controls & safeties

Flow switches, pressure cut-outs, anti-freeze, interlocks and BMS points proven one by one.

Vibration & noise

Pump and fan vibration, alignment check, tower fan balance and noise at the boundary.

Commissioning report & training

Signed report, as-built mark-ups, O&M file and operator training on the panel.

How it works

From first call to handover

  1. 1

    Pre-commissioning checks

    Flushing, pressure tests, rotation, safeties and insulation-resistance before power-up.

  2. 2

    Start-up

    Staged start under MHM supervision; charge, oil and sensor checks on the first run.

  3. 3

    Balancing & tuning

    Flows, setpoints, staging and reset schedules set to the design sequence.

  4. 4

    Witnessed performance test

    Full-load run with your team, readings logged and the report signed on site.

Downloads

Catalogues and data sheets for this work

MHM Chiller SpecificationMHM · Data sheet
423 KB Download
MHM WCS Series CatalogueMHM · Catalogue
605 KB Download
MHM Bottle Type Cooling Tower SpecificationMHM · Data sheet
490 KB Download
MHM Spare Parts List CatalogueMHM · Spare parts list
46 KB Download
MHM AHU / FCU CatalogueMHM · Catalogue
372 KB Download
Carrier VRF Systems CatalogueCarrier · Catalogue
373 KB Download

Open the download centre

Questions

Common questions about testing & commissioning

Yes — third-party commissioning is common for EPC and factory-expansion projects. We report defects to the installer and re-test after they are fixed.

The report states the gap and the cause — undersized pipe, wrong pump, dirty condenser — and we propose the fix with a price.

Talk to the team that does the work

Tell us your plant, brand and problem — an MHM engineer replies within one working day with next steps and a price.